CPCB IV+ emission norms are mandatory for gensets up to 800 kW since July 2023Check if your genset complies
CPCB IV+ Approved Solutions
CPCB-PCLS/12/2021-22 Standard•< 50 mbar Backpressure Drop

Keep Your Existing Genset Running & CPCB IV+ Compliant

You do not need to discard a reliable diesel generator to satisfy statutory environmental directives. Our type-approved Retrofit Emission Control Devices (RECD) capture particulate emissions at the exhaust source — delivering audit-ready compliance in 1 to 2 days at a fraction of replacement cost.

Statutory Regulatory ApplicabilityApplies to in-use diesel generating sets up to 910 kVA under CAQM Direction 76 and State Pollution Control Board guidelines across Delhi NCR and industrial zones.
Economic & Operational Analysis

Retrofit or Replace? The Real Decision Framework

Replacing an operational generator involves crane logistics, civil restructuring, and high capital outlay. Here is how type-approved RECD compares.

Decision ParameterAADEO RECD RetrofitFull CPCB IV+ Genset Replacement
Capital Expenditure (CapEx)Substantially lower (Fraction of new equipment)High CapEx (Rs. 8–25+ Lakhs depending on kVA)
Installation Downtime1 to 2 days on-site3 to 6 weeks (Procurement, rigging & civil rebuild)
Civil & Plantroom AlterationsZero (Exhaust pipe integration only)Extensive foundation, crane rigging & cable rerouting
Statutory OutcomeFully CPCB IV+ / CAQM compliant (In-use sets)Fully CPCB IV+ compliant
Ideal ApplicationGensets with healthy compression & remaining useful lifeSeverely aged units (>15 years) or undersized capacity
Engine Protection

Calibrated Low Backpressure (<50 mbar)

The primary risk of poorly designed aftermarket emission filters is excessive exhaust backpressure. When backpressure exceeds OEM thresholds, exhaust gas temperature spikes, fuel consumption rises, and turbocharger seals degrade.

Zero Engine Derating

Aerodynamically optimized cell matrices ensure engine kilowatt output and transient load response remain at 100% rated capacity.

Automated Electronic Differential Pressure Telemetry

Continuous sensor monitoring tracks pressure differential across the filter element and alerts operators if cleaning is due.

Thermal Expansion Bellows & Bypass Safety

Integrated high-temperature flex bellows prevent vibration fracture, while safety fail-safes protect the generator under all operating loads.

RECD Operational BenchmarksStandard CPCB-PCLS/12/2021-22

PM Capture Efficiency> 70% PM Reduction
Max Allowable Drop< 50 mbar Tolerance
Operating Temperature200°C to 550°C
Installation Time1 to 2 Days On-Site

Engine Compatibility

Compatible with leading industrial diesel engines including Cummins, Kirloskar Oil Engines, Perkins, Mahindra, Caterpillar, and Volvo Penta across all standard ratings up to 910 kVA.

Inspection Readiness

What We Provide for Your Statutory Compliance File

Pollution control board audits require verifiable documentation, not verbal promises. Every AADEO RECD retrofit includes this 4-part legal package:

Type Approval Certificate

Official type approval test certificate issued by accredited testing agencies under CPCB-PCLS/12/2021-22.

Pre & Post Emission Test Report

On-site flue gas emission measurements validating baseline vs post-retrofit particulate reduction on load.

Tamper-Proof Serial Plate

Physical laser-etched metal badge riveted to the device displaying device serial number, model, and approval reference.

SPCB Consent Filing Letter

Formal installation sign-off document formatted for submission to Haryana SPCB, DPCC, or respective state authorities.

Direct Answers

Frequently Answered RECD & Compliance Questions

Factual answers regarding environmental orders, technical suitability, and inspection protocols.

What is a Retrofit Emission Control Device (RECD) and which standard governs it in India?
A Retrofit Emission Control Device (RECD) is an engineered catalytic and particulate filtration system mounted onto the exhaust of an existing in-use diesel generator. In India, RECD systems are tested and certified against CPCB standard CPCB-PCLS/12/2021-22 to capture over 70% of particulate matter (PM) without requiring costly genset replacement.
Do I have to replace my diesel generator under CPCB IV+ or CAQM directions?
No. If your diesel generator is mechanically sound and operates within normal maintenance parameters, CAQM and CPCB regulations permit continued operation when retrofitted with a type-approved RECD or converted to a dual-fuel system (PNG + Diesel). A retrofit typically costs 70% to 80% less than a complete new CPCB IV+ genset replacement.
How does AADEO Solvers ensure the RECD does not damage the generator engine?
Our RECD units are engineered with a calibrated low backpressure drop strictly below 50 mbar, well within the safety tolerance of major OEMs (Cummins, Kirloskar, Perkins, Mahindra). Every system includes a digital differential pressure sensor that continuously monitors exhaust flow and alerts operators before backpressure exceeds threshold limits.
How long does a RECD retrofit installation take?
Installation on-site takes approximately 1 to 2 days per generator. AADEO Solvers conducts an initial site survey to measure exhaust piping dimensions and plantroom space, fabricates custom mounting brackets off-site, and completes the physical hookup and emission testing with minimal operational interruption.
What documentation does AADEO provide for statutory pollution board audits?
We furnish a comprehensive statutory audit dossier: (1) CPCB type-approval certification under CPCB-PCLS/12/2021-22, (2) Pre- and post-installation emission testing validation report, (3) Equipment serial number tagging plate, and (4) SPCB compliance submission letter ready for regulatory filing.
Audit Feasibility

Book a RECD Site Survey for Your Genset

Provide your generator make, model, kVA rating, and exhaust layout. Our engineers will confirm physical dimensions, backpressure compatibility, and supply a fixed-cost proposal.

1
Physical inspection of exhaust manifold & plantroom space
2
Engine health check (oil consumption & exhaust smoke inspection)
3
Guaranteed compliance documentation & installation sign-off
Facing an impending statutory inspection deadline? Call directly:
+91 9773555956
Service Needed *

We use your details only to respond to this enquiry. Privacy Policy.