CPCB IV+ emission norms are mandatory for gensets up to 800 kW since July 2023Check if your genset complies
CPCB IV+ Approved Solutions
Industry Focus · Logistics & Warehousing Hubs

High-Traffic Flooring & Perimeter Security for Logistics Parks

Keep material handling running smoothly with dust-free concrete densification, multi-acre yard perimeter IP surveillance, and instant-transfer backup power for automated sortation and cold chain storage.

Zero Dusting
Penetrating Lithium Densifier
Multi-Acre CCTV
IP67 Perimeter & Dock Coverage
7.5 – 3750 kVA
Cold Chain & Sortation Power
Single Source
Flooring, Power, Security & AMC
Logistics Scope

Engineering for Heavy Throughput & High Asset Turnover

From high-bay narrow-aisle racking to active truck loading docks, we engineer infrastructure that survives constant vehicular friction.

Floor Densification & Joint Protection

Eliminate concrete dusting and joint spalling caused by hard-wheeled reach trucks. Deep chemical densifiers harden the slab matrix, while semi-rigid joint fillers prevent edge chipping.

Wide Perimeter Security & Dock Bays

High-definition optical coverage across truck marshaling yards, perimeter fence lines, entry gates, and individual loading docks with centralized multi-screen VMS monitoring.

Automated Sortation & Cold Chain Power

Prevent temperature excursions in pharmaceutical or perishable cold rooms. Prime and standby diesel generators (7.5 to 3750 kVA) paired with instantaneous AMF changeover panels.

Bottleneck Prevention

Vulnerabilities Disrupting Supply Chain Flow

Floor breakdowns, cargo theft, and refrigeration failures result in immediate supply chain penalties.

Concrete Dusting Fouling Barcode Scanners

Untreated concrete floors release micro-fine particulate dust under forklift friction. This dust coats automated optical sensors, fouls barcode scanners, and creates slip hazards. Penetrating densification permanently seals the slab.

Inventory Shrinkage in Vast Marshaling Yards

Logistics parks spanning multiple acres suffer blind spots along remote perimeter fences and dispatch staging areas. AADEO’s perimeter cameras provide full optical coverage and motion detection.

Chiller Failure Destroying Perishable Cargo

A three-hour grid cut can spoil refrigerated pharmaceutical or food shipments worth millions. Our automatic AMF generators restore continuous refrigeration within seconds of utility cut.

Logistics Engineering Specifications

Field-tested specifications engineered for intensive material handling centers.

SubsystemOperational RequirementVerified Technical Standard
Floor DensificationHeavy Forklift Aisle HardeningLithium silicate deep penetrating densifier, polished dust-proof finish
Joint ProtectionExpansion Joint Repair & ArmorSemi-rigid elastomeric polyurea fillers to resist wheel impact
Perimeter SurveillanceMulti-Acre Logistics Yard & GatesIP67 outdoor cameras, infrared night illumination, high-mast mounting
Standby PowerCold Storage & Conveyor Systems7.5 kVA to 3750 kVA diesel gensets, instantaneous AMF auto-transfer
Emission RetrofitUrban Logistics Park ComplianceCPCB-PCLS/12/2021-22 certified RECD with < 50 mbar backpressure
Standardized Delivery

Our 5-Stage Logistics Facility Lifecycle

01
DISCOVER
Aisle flatness survey, forklift traffic mapping & yard perimeter survey
02
DESIGN
Densifier application schedule, camera line-of-sight & DG load sizing
03
DELIVER
Zoned floor grinding to avoid warehouse disruption & hardware staging
04
COMMISSION
Surface hardness testing, camera angle verification & DG failover test
05
SUPPORT
Quarterly joint maintenance, camera maintenance & generator upkeep
Direct Answers

Logistics & Warehouse Infrastructure FAQ

Actionable engineering facts for supply chain directors, 3PL managers, and facility leads.

Concrete dusting is caused by free lime rising to the slab surface under repeated forklift friction. Our deep chemical densification and penetrating lithium sealers crystallize inside the concrete pores, converting free lime into hard calcium silicate hydrate. This produces an abrasion-resistant, dust-free surface that extends forklift tire and axle lifespan.
We design IP network surveillance grids incorporating high-resolution long-range infrared bullet cameras for perimeter fences, wide-dynamic range cameras for high-contrast loading docks, and central multi-terabyte NVR systems for continuous recording across dispatch bays.
We supply high-efficiency diesel generator sets (from 7.5 kVA to 3750 kVA) equipped with instantaneous AMF switchgear. Upon grid failure, the system automatically transfers power within seconds, keeping chillers, automated conveyor belts, and RF barcode scanners fully operational.
Yes, regional pollution control authorities enforce strict emission limits in logistics and warehousing corridors. We install type-approved RECD units conforming to standard CPCB-PCLS/12/2021-22, achieving over 70% particulate reduction with under 50 mbar backpressure.
Our turnkey service contract combines routine diesel generator servicing, RECD backpressure logging, camera cleaning and network health checks, and floor joint inspection into a single-source operational SLA.
Logistics Facility Survey

Consult With Our Supply Chain Engineers

Tell us your warehouse square footage, forklift axle loads, and power continuity requirements. We schedule an on-site audit to propose an optimal engineering scope.

Logistics Operations Desk
+91 9773555956
Amritansh@aadeo.in
Gurugram, India
Service Needed *

We use your details only to respond to this enquiry. Privacy Policy.